PEME Perfects Print Project

PEME Installation Project

PEME has completed a significant Mechanical and Electrical Installation Project on behalf of a major international packaging and print media company.  The project started with PEME conducting a feasibility study, presenting the client with costed-options and resulted in the project being delivered with the plant owner realising a significant increase in production capacity.

The task involved PEME overseeing the Construction Design and Management (CDM) aspects as well as conducting the Design and Project Installations work.

The PEME Project Manager was Steve Wiles who said “This was a fabulous project, that I thoroughly enjoyed, because it enabled PEME to utilise its integrated engineering services to help the client in exploring available options and provide a holistic solution that delivered the predicted benefits”.

A Case Study providing further details is available.